/ Set
PET blowing machine for 2l Q6000 linear bottle blowing machines are used in the production of PET water bottles, hot filling bottles, carbonated beverage bottles, edible oil bottles, and pesticide bottles. Eceng Machinery's Q linear bottle blowing machine stretches preforms by using a servo motor-controlled stretch rod. The advantage is that it can be stretched in sections,and positioning of the preform is at first in order to ensure the verticality of the preforms during stretching, then secondary stretching.Ensure the uniformity and consistency of each preform stretching.At the same time,bottle blowing machine has a fast stretching speed and precise position.
Stable and accurate running at high speed,adopt more stable and advanced microcomputer PLC control system.
Production process is fully automated, with the advantages of low investment, high efficiency, easy operation, simple maintenance and safety.
Suitable for flexible production of quantity and various bottle shape,wide range of applications,meet customer needs.
Manual and automatic methods of operation, human-machine interface control, simple operation.
Servo transmission system, high positioning accuracy, fast speed stability and good reliability.
Less than 0.2% scrap rate for finished bottle.
Item | Q6000 | |
Bottle type specification | Cavity | 4 |
Theory output | 6000 bph | |
Max.volume | 2L | |
Bottle mouth maximum overall diameter | 28-38mm | |
Bottle biggest diameter | 100mm | |
Bottle maximum height | 330mm | |
Power specification | Light tube quantity | 40pcs |
Light tube power | 1.5KW | |
Maximum heating power | 60KW | |
All electric machine installation | 91KW | |
Actual consumption | 70KW | |
Air pressure specification | Work pressure | 7-9kg/c㎡ |
Low-pressure gas consumption | 1600L/min | |
Blow bottle pressure | 25-35kg/c㎡ | |
Higher -pressure gas consumption | 6000Ltr/min | |
Air pressure specification | Work pressure | 5-6 kg/c㎡ |
Temperature range | 10℃ | |
Consumption | 8000kcal/hr | |
Frozen water flow | 138L/min | |
Machine specification | Machine size | 4.05x2.16x2.45 |
Machine weight | 4.3ton |
Resonable price
Good after service
Experienced skilled workers and professional engineers
Good quality ,excellent service ,long life mould
On time delivery time
Conventional packaging: inside is wrapped with PE film outside is wooden box
1. Installation, debug
We will arrange seasoned technician for debug and test production at the same time make the equipment reach the rated producing
capacity of the line.
2. Training
Our company offer technology training to customer. The content of training is structure and maintenance of equipment, control and operation of equipment. After training, the technician of buyer could master the operation and maintenance, could adjust the process and treat different failures.
3. The sample service
(1) We can send you the video of the running machine.
(2) You are welcome to come to visit our factory,and see the machine running.
(3) We can design the machines according your requirements,at the same time we will give you our professional suggestion,as you know,we have been in this industry for 12 years.
(4) Well-trained & experienced staff are to answer all your inquiries in English and Chinese.
(5) 12 Months guarantee and life-long technical support.
(6) Your business relationship with us will be confidential to any third party.
(7) Good after-sale service offered, please get back to us if you got any questions.
A: We are a direct factory located in Zhangjiagang City. Very close to Shanghai and Wuxi (airport and train provided). If you arrive in Shanghai or Wuxi, we can pick you up to visit our factory.
A: We provide you with high-quality machines with 1-year warranty and lifetime technical support.
A: 1. Through Alibaba's letter guarantee service, it will ensure on-time delivery and the quality of the equipment to be purchased.
2. Through the letter of credit, you can easily lock the delivery time.
3. After visiting the factory, you can ensure the authenticity of our bank account.
A: 1. In order to ensure the accuracy of each part, we are equipped with various professional processing equipment, and we have accumulated professional processing methods in the past few years.
2. Each component before assembly needs to be strictly controlled by inspectors.
3. After all equipment is completed, we will connect all machines and run the entire production line for at least 12 hours to ensure the stable operation of the customer's factory.